Aris mining announces High Grade Drill results from ongoing Segovia Operations Exploration Program
13 August 2024
Aris Mining Corporation announces the results received to date from its ongoing 2024 exploration drilling program at its Segovia Operations in Colombia, which is now 70% complete.
Neil Woodyer, CEO of Aris Mining, commented "Our drilling program continues to deliver high grade intersections, confirming the continuity and extension of the large scale veins at depth and along strike, and supporting Segovia's status as one of the highest grade gold operations in the world. The identification of new, near mine mineral resources are expected to progressively lengthen the currently defined mine life, and to provide future low development cost mill feed to supplement the processing plant expansion currently underway.
We are especially excited by the results of our ongoing data verification and new drilling programs at Cristales, which are expected to result in significant additions to inferred mineral resources and have the potential to connect the Cristales vein with the substantial vein systems at El Silencio".
The intersections provided in this news release include results received since the Company's previous exploration news release dated August 16, 2023, which had a data cut-off date of July 31, 2023, up to validated sample assays available as of April 1, 2024. These results are expected to be included in the Company's updated mineral resource and reserve estimates expected in the fourth quarter of 2024.
Vein intersection grades remain high after diluting the vein width to the planned mining widths for extraction using narrow vein mining methods. In addition to exploration drilling, ongoing channel samples of the veins at the actively advancing work faces also continue to provide new data to upgrade mineral resources to mineral reserves.
About Aris Mining:
Aris Mining is a gold producer in the Americas, currently operating two mines with expansions underway in Colombia. The Segovia Operations and the Marmato Upper Mine produced 226,000 ounces of gold in 2023. Aris Mining is targeting a production rate of approximately 500,000 ounces of gold per year in the second half of 2026, following a ramp-up period after the Segovia mill expansion scheduled for completion in Q1 2025 and the Marmato Lower Mine's first gold pour in late 2025. Aris Mining also operates the 51% owned Soto Norte joint venture, where Feasibility level studies are underway on a new, smaller scale development plan, with results expected in early 2025. In Guyana.
Aris Mining is advancing Toroparu, a gold/copper project. Aris Mining intends to pursue acquisitions and other growth opportunities to unlock value through scale and diversification.
Aris Mining promotes the formalization of traditional miners into contract mining partners as this process enables all miners to operate in a legal, safe and responsible manner that protects them and the environment.
Source: .prnewswire.com