Canada Nickel Confirms Discovery at Mann Central, Successfully Completes Initial Drilling at Mann Northwest Property

23 February 2024

Canada Nickel Company Inc. is pleased to announce the final set of assay results from its initial exploration program at the Mann Property, a joint venture with Noble Mineral Exploration Inc. ("Noble") whereby Canada Nickel can earn an 80% interest by completing certain cash and share payments and exploration expenditures (see original press release dated November 22, 2021).

Commenting on these initial results, Mark Selby, CEO of Canada Nickel said, "Mann is an exceptionally large property with ultramafic targets extending beyond the township from Reaume through Mann and into Newmarket with a combined target strike length of over 25 kilometres.  All fifteen initial holes at these first two targets successfully intersected large intervals of target mineralization. This area will be a focus of our exploration program in 2024.  Further details on our 2024 exploration program will be provided at a conference call on Friday, February 23rd at 11am."

Mann Property

The Mann Property is located 22 kilometres east of Crawford, 20 kilometres south of Cochrane, and 45 kilometres northeast of Timmins, covering Mann Township. The property contains three large ultramafic bodies, each of which has a target geophysical footprint larger than Crawford at 1.6 km2. Mann Northwest has a target footprint of 6.0 km2; Mann Central is 3.1 km2 and Mann Southeast is 4.1 km2. Mann Northwest is on same trend to mineralized ultramafics in Reaume Township while Mann Southeast connects to a long ultramafic sill in Newmarket Township, both properties being owned by Canada Nickel. The total trend from Reaume to Newmarket exceeds 25 kilometres as various units.

This press release summarizes drill results from Mann Northwest and Mann Central that were completed during the summer of 2023. Mann Southeast is planned to be drilled during the summer of 2024.

Mann Northwest

The drill program at Mann Northwest consisted of nine drillholes, with all holes intersecting mineralized sections of predominantly well serpentinized peridotite and dunite (see press release August 22, 2023, for results of the first five holes).

Eight of the nine drillholes delineated mineralization along a 2.7 kilometre strike length within a folded structure having a width of at least 500 metres (see Table 1 and Figure 1). The target remains open in all directions. The ninth hole (MAN23-06) was drilled on a north extension of the main target area. The strike length of this sub extension remains to be tested.

Platinum group metals (PGMs) were also intersected in addition to the nickel mineralization. The PGMs are associated with highly serpentinized peridotite-pyroxenite with hole MAN23-13, for example, intersecting interlayered pyroxenite grading 0.43 g/t platinum+palladium (Pt+Pd) over 16.5 metres.

Mann Central

Six drillholes delineated mineralization along a 2,500 metre strike length and over a width of at least 600 metres. The target remains open in all directions. All six drillholes intersected strongly serpentinized peridotite-dunite, with visible nickel mineralization. PGMs were also intersected in Mann Central within a pyroxenite horizon with hole MAN23-11 intersecting 0.55 g/t Pt+Pd over 28.5 metres.

Participants may join the webcast and call as follows:
Audience URL: https://app.webinar.net/P1exkL4kgN2

Dialing local Toronto: 416-764-8688
Dialing North American Toll Free: 888-390-0546
Dialing International Toll Free:
Australia: 1800076068
Germany: 08007240293
Switzerland: 0800312635
South Africa: 0800994942
UK (England): 448006522435

For those unable to participate, a web based archive of the conference call will be available for playback at the same Audience URL used to access the live webcast.

Statement Regarding TSX Venture

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Quality Assurance and Control, Drilling and Assaying

Edwin Escarraga, MSc, P.Geo., a "qualified person" as defined by National Instrument 43-101, is responsible for the on-going drilling and sampling program, including quality assurance (QA) and quality control (QC). The core is collected from the drill in sealed core trays and transported to the core logging facility. The core is marked and sampled at 1.5 metre lengths and cut with a diamond blade saw. One set of samples is transported in secured bags directly from the Canada Nickel core shack to Actlabs Timmins, while a second set of samples is securely shipped to SGS Lakefield for preparation, with analysis performed at SGS Burnaby or SGS Callao (Peru). All are ISO/IEC 17025 accredited labs. Analysis for precious metals (gold, platinum and palladium) are completed by Fire Assay while analysis for nickel, cobalt, sulphur and other elements are performed using a peroxide fusion and ICP-OES analysis. Certified standards and blanks are inserted at a rate of 3 QA/QC samples per 20 core samples making a batch of 60 samples that are submitted for analysis.

Qualified Person and Data Verification

Stephen J. Balch P.Geo. (ON), VP Exploration of Canada Nickel and a "qualified person" as such term is defined by National Instrument 43-101, has verified the data disclosed in this news release, and has otherwise reviewed and approved the technical information in this news release on behalf of Canada Nickel Company Inc.


 

Source:prnewswire.com